Location: Oak View, CA
Client: Ventura County Public Works
The Santa Ana Bridge Project is the first major component of the Matilija Dam Ecosystem Restoration Project, which will remove the obsolete dam to restore habitat for the endangered Southern steelhead while allowing for natural transport of sand and cobble to Ventura County’s eroding beaches. Dam removal will take advantage of high river flows to naturally remove the accumulated sediment that has rendered Matilija Dam obsolete. These renewed flows necessitate a number of downstream infrastructure components that must be completed prior to dam removal, including upgrades to flood control and water supply facilities, as well as the replacement of two bridges.
Chris Hooke, PE
Deputy Director, Design & Construction
Roads & Transportation