Interstate 5 Pavement Rehabilitation

Restoring Strength Beneath One of California's Essential Freeways.

Interstate 5 Concrete Pavement Rehabilitation, Burbank | Job 458

The long-term performance of a freeway depends on the integrity of its pavement and underlying structural layers. When deterioration extends beyond the driving surface, effective rehabilitation requires a comprehensive reconstruction approach.

SPC completed an $11.2 million pavement rehabilitation project along Interstate 5 in Burbank, California, replacing deteriorated concrete pavement and underlying base materials within a one-mile freeway corridor.

The project combined substantial concrete reconstruction with traffic management and supporting roadway improvements to restore pavement integrity and extend service life.

Project at a Glance

Client: Caltrans District 7

Location: Burbank, California

Contract Value: $11.2 Million

Project Start: January 2026

Category: Highways / Heavy Civil Construction

Status: Construction Work Completed

Contract Value
$ 0 M
Project Corridor
1 MILE
New Concrete Pavement
0 CY
Rapid-Setting Lean Concrete Base
0 CY
Existing Pavement and Base Removed
0 CY

The Challenge

Rebuilding Pavement
Within a High-Traffic Corridor

Severely cracked and unstable pavement required replacement of both the existing concrete surface and underlying base.

Working within an active Interstate 5 corridor required traffic control, temporary barriers, pavement markings, and measures to protect motorists approaching construction zones.

The work also required coordination of concrete pavement replacement and related freeway traffic-management systems.

The Approach

Reconstructing for
Long-Term Performance

Severely cracked and unstable pavement required replacement of both the existing concrete surface and underlying base.

Working within an active Interstate 5 corridor required traffic control, temporary barriers, pavement markings, and measures to protect motorists approaching construction zones.

The work also required coordination of concrete pavement replacement and related freeway traffic-management systems.

The Impact

A Stronger Roadway
for the Miles Ahead

The reconstructed pavement is intended to provide improved ride quality, renewed structural performance, and longer pavement service life.

These improvements support the continued reliability of Interstate 5 through Burbank while reducing the likelihood of recurring pavement-related maintenance.

A major six-lane grade separation eliminating a railroad crossing in Oxnard, improving transportation safety and mobility through complex bridge construction and roadway improvements.

A major taxiway reconstruction at Ontario International Airport, combining large-scale concrete paving, on-site production, drainage improvements, and specialized airfield construction.

A multi-phase taxiway reconstruction and rehabilitation project at Santa Barbara Municipal Airport, combining pavement improvements, drainage infrastructure, and active-airfield coordination.