State Route 241 Pavement & Groundwater Rehabilitation

Solving What Lies Beneath the Surface.

SR-241 Pavement Repair and Groundwater Improvements | Job 409

Long-lasting roadway performance begins below the pavement. When subsurface conditions compromise structural stability, successful rehabilitation requires addressing the underlying problem, not simply repairing the surface.

SPC completed an $18.2 million pavement rehabilitation and groundwater mitigation project along approximately 10 miles of State Route 241 in Orange County. The project combined extensive asphalt repairs with drainage improvements designed to reduce recurring pavement distress caused by groundwater and expansive soils.

Project at a Glance

Client: Caltrans District 12

Location: Orange County, California

Project Value: $18.2 Million

Completed: August 2024

Duration: Approximately 2 Years, 7 Months

Category: Highways / Heavy Civil Construction

Status: Completed

Project Value
$ 0 M
Project Corridor
0 Miles
Perforated Underdrain Pipe
0 LF
Labor Hours
0
Completion
August 2021

The Challenge

Addressing the Root Cause

Sections of SR-241 experienced significant pavement depressions and deteriorating ride quality associated with subsurface moisture and expansive soils.

With construction spread across multiple locations along an active toll road, SPC faced the additional challenge of coordinating excavation, drainage installation, paving, and material hauling within restricted work zones and nighttime closure windows.

The Approach

Integrated Pavement
and Drainage Solutions

Rather than focusing exclusively on surface repairs, SPC combined pavement excavation and replacement with groundwater-exclusion trench systems and approximately 20,000 linear feet of perforated underdrain pipe.

The work required coordination of earthwork, asphalt paving, drainage construction, trucking, and traffic control across multiple locations.

By managing these interconnected operations, SPC addressed both visible pavement deterioration and the underlying conditions contributing to recurring damage.

The Impact

Greater Reliability
Beneath Every Mile

Completed on time, the project restored pavement conditions and improved ride quality along a major Orange County transportation corridor.

The combination of pavement rehabilitation and groundwater mitigation is intended to extend roadway service life, reduce future deterioration, and support safer, more reliable travel.

A comprehensive concrete pavement rehabilitation along Interstate 5 in Burbank, restoring structural integrity through pavement and base reconstruction within an active freeway corridor.

A $17.9 million airfield reconstruction combining extensive pavement replacement, subgrade stabilization, drainage improvements, and modern lighting within an active airport.

A complex bridge replacement and interchange reconstruction above active Interstate 215, improving structural reliability, roadway capacity, and regional connectivity through carefully coordinated construction.