Santa Barbara Municipal Airport Taxiway Reconstruction

Rebuilding Critical Airfield Infrastructure While Keeping Operations Moving.

Taxiways E, A3, and A5 Pavement Reconstruction | Job 465

Airport infrastructure demands precision, reliability, and careful coordination, especially when construction takes place alongside active aviation operations.

SPC is undertaking an $8.7 million taxiway reconstruction and rehabilitation project at Santa Barbara Municipal Airport. The work combines pavement reconstruction, surface rehabilitation, drainage improvements, and airfield system upgrades to support safe and reliable aircraft movement.

Project at a Glance

Client: City of Santa Barbara

Location: Santa Barbara, California

Original Contract Value: $8.7 Million

Project Start: November 2026

Anticipated Completion: May 2027

Category: Airports / Heavy Civil Construction

Status: Initial Construction Phase

Original Contract Value
$ 0 M
Included in Project Title
0 PRIMARY TAXIWAYS
Base-Bid Phases
0 CALENDAR DAYS
Anticipated Completion
MAY 2027

The Challenge

Building Within an Active Airport

The project involves multiple taxiway locations, each requiring different levels of pavement reconstruction, rehabilitation, or surface treatment.

Construction must be coordinated around aircraft movements, controlled access routes, restricted work zones, utility protection, and airport security requirements.

Strict foreign object debris prevention, temporary barricades, airfield closures, and specialized construction phasing are essential to maintaining safe airport operations.

The Approach

Coordinated Construction
Across Multiple Phases

SPC’s planned scope includes pavement removal and milling, excavation, subgrade preparation, lime treatment, aggregate-base construction, asphalt paving, drainage improvements, and supporting civil work.

The project also incorporates stormwater infrastructure, infiltration trenches, pavement markings, and airfield electrical improvements.

Through coordinated construction sequencing and communication with airport operations and inspection teams, SPC is preparing to execute these improvements while maintaining the safety and functionality of the surrounding airfield.

The Impact

Built for Continued Reliability

Once completed, the project is expected to restore deteriorated taxiway pavement, improve drainage, and renew supporting airfield infrastructure.

The improvements will help maintain safe aircraft movement and support the long-term performance of Santa Barbara Municipal Airport.

A major mobility improvement program in Goleta combining bridge replacement, roadway extensions, roundabouts, drainage, and environmental improvements through coordinated construction.

A $24 million freeway infrastructure rehabilitation project replacing overhead signs and structures while upgrading roadway safety systems along State Route 91.

A major six-lane grade separation eliminating a railroad crossing in Oxnard, improving transportation safety and mobility through complex bridge construction and roadway improvements.