Ontario International Airport Taxiway S Reconstruction

Large-Scale Airfield Construction. Precision at Every Stage.

Taxiway S East Reconstruction | Job 459

Reconstructing critical aviation infrastructure requires a combination of technical precision, production capacity, and coordinated execution, particularly when construction takes place within an operating international airport.

SPC completed a $23.4 million reconstruction of Taxiway S at Ontario International Airport, renewing concrete taxiway pavement, asphalt shoulders, drainage systems, airfield lighting, and supporting infrastructure.

The project combined substantial concrete paving operations with specialized construction methods, on-site material production, and carefully coordinated work within restricted airfield construction windows.

Project at a Glance

Client: Ontario International Airport Authority

Location: Ontario, California

Contract Value: $23.4 Million

Completed: September 2026

Category: Airports / Heavy Civil Construction

Status: Completed

Contract Value
$ 0 M
New Concrete Taxiway Pavement
0 SF
Existing Reinforced Concrete Removed
0 TONS
Dual 60-Inch Drainage System
0 LF
Pavement Joint Sealing
0 LF

The Challenge

Major Reconstruction Within
an Active International Airport

The project required full-depth taxiway reconstruction while accommodating aircraft movements, security requirements, controlled access routes, and construction phasing.

Coordinating concrete production, pavement placement, drainage installation, electrical upgrades, and quality inspections required detailed scheduling and disciplined field operations.

Construction also involved substantial demolition and material hauling, along with strict requirements for airfield safety and pavement performance.

The Approach

Integrated Production
and Construction

SPC coordinated large-scale concrete paving operations supported by on-site batching, planned placement sequences, and specialized sawcutting and inspection activities.

The work included removal of existing pavement, excavation, cement-treated soil, lean concrete base, new concrete taxiway pavement, asphalt shoulders, drainage improvements, and airfield electrical systems.

The construction plan integrated SPC’s paving operations with specialized subcontractors, testing teams, and airport stakeholders to manage complex work sequences within defined construction windows.

The Impact

Renewed Infrastructure
for Continued Operations

The reconstructed taxiway provides renewed pavement and supporting systems designed to meet the demands of continued airport operations.

Drainage improvements, including a dual 60-inch pipe system, support stormwater management, while pavement reconstruction and airfield system upgrades contribute to long-term infrastructure reliability.

A complex bridge replacement and interchange reconstruction above active Interstate 215, improving structural reliability, roadway capacity, and regional connectivity through carefully coordinated construction.

A $17.9 million airfield reconstruction combining extensive pavement replacement, subgrade stabilization, drainage improvements, and modern lighting within an active airport.

A major six-lane grade separation eliminating a railroad crossing in Oxnard, improving transportation safety and mobility through complex bridge construction and roadway improvements.