Improving Highway Safety Across an Active Transportation Corridor.
SR-91 Overhead Sign and Sign Structure Rehabilitation | Job 455
Highway infrastructure extends beyond the roadway itself. Signs, structures, barriers, and supporting systems are essential to maintaining safe and reliable travel across heavily used transportation corridors.
SPC is delivering a $24 million rehabilitation project along State Route 91 between Los Angeles and Cerritos, replacing and upgrading overhead and roadside signs, sign structures, and associated highway infrastructure.
The project combines structural construction, roadway safety improvements, lighting, landscaping, and traffic management within an active freeway environment.
Client: California Department of Transportation
Location: Los Angeles County, California
Contract Value: $24 Million
Project Start: December 2025
Anticipated Completion: May 2028
Delivery Method: Design-Bid-Build
Category: Highways / Heavy Civil Construction
Status: Active
Replacing overhead sign structures requires carefully coordinated construction operations while maintaining traffic through a heavily traveled freeway corridor.
The project involves numerous lane-closure configurations, daytime and nighttime operations, structural drilling, concrete barriers, bridge railing upgrades, and coordination with Caltrans.
Existing field conditions and design discrepancies have also required additional review and coordination before construction activities could proceed.
SPC is performing roadway excavation, grading, cast-in-drilled-hole foundation work, concrete barrier construction, overhead sign structure removal and replacement, and maintenance vehicle pullout improvements.
During project reviews, SPC identified field conditions that did not align with the original plans and coordinated with Caltrans to address necessary design revisions.
The work also involves coordination of specialized subcontractors responsible for lighting, landscaping, reinforcing steel, and other supporting improvements.
Through proactive field review and communication, SPC is working to resolve construction issues before they affect downstream operations.
Once completed, the project is intended to modernize aging sign infrastructure, improve roadside safety features, and support clearer highway guidance along State Route 91.
These improvements will contribute to the long-term functionality and reliability of an important Southern California transportation corridor.