Building Above the Crossing. Moving Beyond the Congestion.
Rice Avenue / Fifth Street / State Route 34 Grade Separation | Job 447
Some infrastructure projects do more than improve transportation. They fundamentally change how communities move, eliminating longstanding conflicts while creating safer, more reliable connections.
SPC is constructing a major grade separation in Oxnard, California, replacing an existing at-grade railroad crossing with a new six-lane bridge carrying Rice Avenue over Fifth Street, State Route 34, and Union Pacific Railroad tracks.
The project brings together bridge construction, roadway realignment, utility relocation, drainage improvements, and transportation safety upgrades within an active corridor.
Client: City of Oxnard
Location: Oxnard, Ventura County, California
Original Contract Value: $76.5 Million
Anticipated Completion: December 2028
Delivery Method: Design-Bid-Build
Category: Bridges / Highways / Rail Infrastructure
Status: Active
The existing crossing brings vehicles, pedestrians, bicyclists, and railroad operations into a shared transportation environment, creating safety concerns and traffic delays.
Construction requires SPC to coordinate major structural operations around active railroad schedules, ongoing roadway traffic, extensive underground utilities, and limited equipment access.
Additional complexities include groundwater management, sewer relocation, changing soil conditions, large-component deliveries, and coordination with multiple public agencies and utility providers.
SPC is managing construction of the new bridge, roadway connections, retaining walls, drainage infrastructure, utility improvements, and associated civil work.
The team has adapted construction sequencing to accommodate railroad requirements, utility conflicts, and changing field conditions. When material shortages and unexpected underground conditions affected planned activities, SPC coordinated alternative resources and adjusted construction methods to maintain progress.
Through self-performed grading, paving, concrete work, traffic control, and utility operations, SPC maintains direct involvement in critical construction activities.
Once complete, the new six-lane bridge will eliminate the existing at-grade railroad crossing, reducing conflicts between trains and roadway users while improving traffic circulation.
Additional bicycle lanes, sidewalks, accessibility improvements, and roadway upgrades will support safer transportation for motorists, pedestrians, cyclists, and regional freight operations.