Washington Street Overcrossing at I-215

Rebuilding a Critical Connection Above an Active Interstate.

Colton Bridge Widening | Job 401

Replacing a major freeway overcrossing requires more than structural construction. It demands precise coordination, careful sequencing, and the ability to execute complex operations while keeping surrounding transportation networks moving.

SPC completed an $18.1 million bridge and interchange reconstruction project in Colton, California, replacing the aging Washington Street Overcrossing above Interstate 215. The project addressed structural deficiencies, inadequate vertical clearance, and increasing traffic demands while improving roadway capacity and connections for motorists, pedestrians, and cyclists.

Project at a Glance

Client: Caltrans District 8
Location: Colton, California
Project Value: $18.1 Million
Completed: January 2024
Duration: Approximately 2.5 Years
Category: Bridges / Highways
Status: Completed

Category

Final Construction Value
$ 0 M
Debris Removal Crew-Days
0 FT
Asphalt Placed
0 TONS
Excavation
0 CY
Concrete Placed
0 CY

The Challenge

Replacing a Bridge Without
Stopping the Region

The Washington Street Overcrossing spans one of the region’s active interstate corridors. Demolishing and replacing the structure required carefully coordinated freeway closures, heavy lifting operations, and staged construction while maintaining access through the surrounding interchange.

Limited work areas, existing utilities, adjacent streets, and continuous traffic demands added complexity. Bridge demolition, precast girder installation, retaining walls, roadway reconstruction, and paving operations had to be sequenced around restricted construction windows.

The Approach

Coordinated Construction
at Every Stage

SPC managed the bridge replacement and reconstruction of surrounding ramps, approaches, intersections, and roadway infrastructure.

Self-performing major heavy civil operations, including demolition, earthwork, grading, paving, and concrete construction, allowed SPC to maintain greater control over critical activities and coordinate multiple construction phases.

Careful traffic management and nighttime operations supported major structural activities while minimizing disruption to Interstate 215 and nearby communities.

The Impact

A Stronger Connection
for the Future

The completed project replaced a deficient bridge with a wider, more reliable structure, improved vertical clearance, increased roadway capacity, and enhanced pedestrian and bicycle access.

By modernizing the Washington Street interchange, SPC helped strengthen an essential east-west connection serving Colton and the surrounding San Bernardino County region.

A $24 million freeway infrastructure rehabilitation project replacing overhead signs and structures while upgrading roadway safety systems along State Route 91.

A comprehensive concrete pavement rehabilitation along Interstate 5 in Burbank, restoring structural integrity through pavement and base reconstruction within an active freeway corridor.

A major taxiway reconstruction at Ontario International Airport, combining large-scale concrete paving, on-site production, drainage improvements, and specialized airfield construction.